NGUYEN NHUT TRUONG
Over (10) years of experience, specializes in Piping designing for Offshore Oil & Gas Units and Refinery Petrochemical Plants.
PIPING DESIGNING
Piping Construction & Material Specification
Piping & Instrument diagrams for:
– High pressure Mud, Cement, C&K piping system;
– Low pressure Mud processing system;
– BOP & Diverter hydraulic system;
– Drill floor hydraulic system;
Piping modeling
Piping MTO
Piping isometric
Piping plan layout
Piping support
DRILLING EQUIPMENT DESIGNING
Drilling equipment MTO & capacity sizing
Drilling Equipment arrangement:
– Rig floor rotating & hoisting system;
– Mud processing system;
– BOP – Well control system;
– Conductor tensioning system
3D Equipment modeling
PIPING CONSTRUCTION & INSTALLATION
Method statement & lifting plan
Workfront for piping installation schedule
Test packages for piping pressure testing
PROCUREMENT & COMMISSIONING
Technical Requirement
Technical Clarification & Evaluation
Commissioning procedures & testing
PROJECT OF CONSTRUCTION, INSTALLATION & PRE-COMMISSIONING FOR PACKAGE A1 OLEFINS PLANT, LONG SON PETROCHEMICAL COMPLEX
– Lead piping engineer –
PROJECT OF BUILDING TAMDAO05 JACKUP RIG
– Drilling equipment design engineer –
PROJECT OF CONSTRUCTION & INSTALLATION FOR PP4 – HYOSUNG CHEMICAL COMPLEX
– Lead piping engineer –
PROJECT OF INSTALLATION GASLIFT SEPARATOR FOR WELL HEAD PLATFORM (WHP) E1 – JVPC
– Piping engineer –
PROJECT OF DESIGNING H&I PACKAGE FOR LONG SON PETROCHEMICAL COMPLEX IN TERMS OF: PIPING | STRUCTURE | EQUIPMENT | HVAC
– Engineering lead –
PROJECT OF BUILDING FEED BARGE
– Piping design engineer –
PROJECT OF DESIGNING FOR SAKATA CHEMICAL PLANT
– Engineering team leader –
PROJECT OF REPAIRING MURMANSKAYA JACKUP RIG
– Piping engineer –